Wednesday Night Project Update: I did not make it to the Liberty house, but Æsa did. She gave out candy to around two dozen children, without decorating the house. Next year we’ll do the holiday right. She also did the first of many polyurethane coatings on the floors. She’s doing […]
Monthly Archives: October 2018
Tuesday Night Project Update: The stain used on the floor was a two step system, so Æsa and I went over to the house after work tonight to wipe up the excess stain before she could clear coat it with the polyurethane sealant. Honestly, she had most of it wiped off by […]
Sunday Project Update: Æsa went to the Liberty house today and rocked the casbah with the staining of the floors. I’ll let the pictures do the rest of the talking. She also checked the attic and didn’t see any fresh leaks, so maybe the foam sealing did the trick!
Friday Project Post: For our date day, Æsa and I were gifted with some materials to help with building the Liberty house, some pieces of furniture, and we were able to help clean up a garage where all those items were stored. Then we went to Liberty to finish up the paper […]
Tuesday Update: New Furnace has been successfully delivered. Only the exhaust vent was dented in the process. It now waits patiently to be installed. Plumbing may also get done in the next week. Propane is being scheduled as soon as possible, but that may take a few weeks. Electrical is […]
Quick update: We’re still working on the floors in the living room and the dining room. We were able to finish the edging around both tonight. Added a picture of what the floor will look like when dry, prior to the staining. More to come. Now, sleep.
Saturday Project Update: Æsa Sturludottir continues to linseed oil the joists. She discovered the sump pump hose out of the sewer drain again, and caught the water filling up the basement. We added a few more bungee cords to hold it in place. The dehumidifier was giving a P6 error and […]
Monday morning project update: We have internet again! A 15 minute fix for the coaxial cable that was cut during the joists replacement was done today. I also closed all the windows that I could in the house to start keeping some warmth in. There’s a light rain today, but […]
Sunday afternoon project update: Well, today wasn’t that good of a day. The maple hardwood flooring that we were going to get had already been sold. It was enough to cover both floors for $100.00, but we were too slow to catch it. Also, the pellet stove we were going […]