KEY | |||
---|---|---|---|
NO SERVICE | PARTIAL SERVICE | ||
FINAL TOUCH UPS | FULLY OPERATIONAL |
Current Status Report | ||||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Basement | Basement | This is the underground portion of the house that holds most of the mechanical systems for the house. | Copper Thieves: Due to the house being vacant, vandals broke into the house and ripped out most of the copper from the basement, and damaged the furnace beyond repair. |
|||
Windows | There are 6 Windows in this room. | Some of the windows have broken panes in them which are being repaired. | ||||
Circuit Breaker Box | The electrical system main box. | The Circuit Breaker Box has been replaced with an Outdoor Rated Box and new Breakers. The electrical service has been restored to all areas of the house. |
||||
Propane (Formerly Oil) Furnace | The propane furnace will be the main heating source for the house including hot water and baseboard hot water heat. | It is our plan to transition to a Propane heating service and furnace.
We need the chimney lined with a propane rated pipe. 2/8/19 Update: Chimney Liner installed! 2/10/19 Update: Furnace was fired up and we have full hot water service! |
||||
Sump Pump | When water gets into the Basement, it needs to be removed by the Sump Pump. | This was replaced during the winter prior to renting of the property. | ||||
Sewer Lines | The system to pipe out all of the liquid and semi-solid waste material in the house. | The sewer PVC was all cut out when the joists were replaced.
2/10/19 Update: All pipes except for the Sump Pump connection has been reconnected. |
||||
Water Plumbing | The inbound water for the entire house. | |||||
Joists & Main Girder | Most of the 54 joists and main girder are compromised by water and mold damage due to neglect. | The Joists and Main Girder were replaced to the tune of $24,000.00 dollars and took the workers 5 days to complete once they started working. | ||||
Electric | Plugs & Light Switches within the room. | The wiring throughout the house has been completed! | ||||
Water Meter | The main connection from the town to the house for water service. | The Water Meter for the town has been reinstalled in the house and there is a garden hose currently hooked up to it in order to get water when needed in the house. |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Main Hallway | The 1st Floor Hallway for the house connects the outside to the Living Room, Parlor, Harry Potter Suite, and the stairway leading to the 2nd floor. |
Weak Flooring: Due to the damage in the basement the entire floor of the room is not able to be used.
Update: The floors are fixed! |
|||
Windows | There are 0 Windows in this room. | The stairwell has two stained glass windows. | ||||
Front Door | There was additional insulation installed around and in the door to help seal the cold air out. | |||||
Electric | Plugs & Light Switches within the room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | Copper Thieves: Due to copper thieves, several baseboards were damaged and need repair before the heat can be restored throughout the house. The pipes have been repaired/replaced! |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Living Room | The main room on the 1st floor that has a fireplace and leads into the Dining Room. | Weak Flooring: Due to the damage in the basement the entire floor of the room is not able to be used.
Update: The floors are fixed! The Paper Bag Floor has been added! |
|||
Windows | There are 3 Windows in this room. | One window is stained glass and the other two are normal.
Update: The one that was boarded up when we first looked at the house now has two brand new panes of glass! |
||||
Electric | Plugs & Light Switches within the room. | |||||
Living Room Fireplace | A full sized fireplace in the Living Room. | The Living Room Fireplace has a chimney that has been blocked off in the Attic and does not vent out of the house. We will be converting this into a vent-less propane fireplace. Update: We have the propane fireplace in place, just waiting for the propane service to get installed. |
||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | Copper Thieves: Due to copper thieves, several baseboards were damaged and need repair before the heat can be restored throughout the house. The pipes have been repaired/replaced! |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Dining Room | The main eating & entertaining room for the home. | Weak Flooring: Due to the damage in the basement the entire floor of the room is not able to be used.
Update: The floors are fixed! The Paper Bag Floor has been added! |
|||
Windows | There are 4 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Parlor | The Parlor has an original 1894-96 coal fireplace and an octagonal extension with an entrance to the front porch. | Weak Flooring: Due to the damage in the basement the entire floor of the room is not able to be used.
Update: The floors are fixed! The Fireplace needs to have a mason come in and fix the tiling, however for the moment the room is mostly usable. |
|||
Windows | There are 4 Windows in this room. | |||||
Coal Fireplace | An original 1894-1896 Coal Fireplace. | Weak Flooring: Due to the damage in the basement some of the floor in the room is not able to be used. Update: The floors are fixed! We currently have the area in front of the fireplace taped off. The chimney will need a new flue installed and the top of the chimney reconstructed before the fireplace can be used for any type of heating. |
||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | Copper Thieves: Due to copper thieves, several baseboards were damaged and need repair before the heat can be restored throughout the house. The pipes have been repaired/replaced! |
||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Parlor Door | We removed the screws and replaced the damaged Dead Bolt with one that we had a key for. | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Half Bath | The bathroom on the first floor currently has a sink and a toilet. | Plumbing: We have a camp toilet in the bathroom right now in order to be able to use some facilities within the house. | |||
Windows | There are 0 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Toilet | Plumbing: The toilet needs to be re-seated on the sewer line and connected to the water lines to be fully functional.
The pipes have been repaired/replaced! |
|||||
Sink | Plumbing: The sink needs to be connected to the water lines to be fully functional.
The pipes have been repaired/replaced! |
|||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Kitchen | The main cooking room for the house. | Peeling Paint & Cracked Walls: The Kitchen has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 3 Windows in this room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Kitchen Door | The Padlock was completely removed and the Dead Bolt replace with one that we have a key for. We are currently replacing the caulking around the windows in the door and stripping the paint off of the wood. |
|||||
Side Door | Outside Door that leads to the Basement. | The Side door has a Dead Bolt that we do not have a key for, and requires some TLC to get functional again. | ||||
Refrigerator | A medium sized refrigerator comes with the house. | |||||
Kitchen Sink | A Stainless Steel sink comes with the house. | Plumbing: We are using a 5 gallon bottled water tank to wash hands and items in the sink. The sewer connection works.Plumbing: The sink needs to be connected to the water lines to be fully functional.
The pipes have been repaired/replaced! |
||||
Dishwasher | There is a built-in Dishwasher in the Kitchen. | Plumbing: Due to the damage in the basement, the plumbing to the Dishwasher needs to be repaired before it can be used.
The pipes have been repaired/replaced! |
||||
Kitchen Cupboards | There is a full set of shelves and drawers in the Kitchen. | The doors that were damaged have been taken off and are being looked at to be repaired. The insides of |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Butler’s Pantry | There is an additional room off the Kitchen that we will use for the Washer/Dryer and Pantry. | Peeling Paint and Wall Repair: The Butler’s Pantry needs to be stripped of all the peeling paint and once the floor joists are repaired any damage to the walls fixed in order to put in shelves for the canned food we wish to keep in there. The cabinets need to be fixed and the current shelf in there removed to complete the updates to our thoughts about the room. |
|||
Windows | There are 1 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! Additionally, a normal plug and a dryer plug have been added to this room! | ||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Washer | Currently None | The pipes have been repaired/replaced! | ||||
Dryer | Currently None | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Stairs to the 2nd Floor | Beautiful solid wood stairway that leads to the 2nd Floor | Woodwork: We have used Murphy’s Oil Soap to wash down the wood and Linseed Oil to start repairing the wood within the stairs. | |||
Windows | There are 3 Windows in this room. | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Front Porch | Large wrap around porch that connects the Front Door and the Parlor Door to the outside. | Rotted Posts: The Front Porch is listing more than it should because the posts to hold it up were placed right on the ground and have rotted away. |
|||
Front Porch Steps | 3 stairs | The Steps are now on a concrete platform and have 4×4 posts that the Stringers are attached to for support. There is still water damage and rotten wood that will need to be repaired, however the stairs are usable now. |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
1st Floor | Back Porch | Small rectangular back porch that connects the Kitchen Door to the outside. | Rotted Posts: The Back Porch is listing more than it should because the posts to hold it up were placed right on the ground and have rotted away. |
|||
Back Porch Steps | 5 stairs | Porch Steps Repair: The Stringers for the Back Porch Steps are resting right on the dirt ground and have rotted away. Water damage from the years of neglect have allowed multiple steps to also rot into sawdust. |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Main Hallway | The hallway that connects the SCA Room, Game Room, Tiger Room, Main Bathroom, and Lovecraft Room together and the path to the 1st Floor. |
Peeling Paint: The 2nd Floor Main Hallway has paint that is chipping and peeling away from the walls. | |||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Windows | There are no Windows in this area. | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Hobby Room | The small room frequently located near the top of the stairs from the first floor, is what many folks have called the “fainting room.” |
Peeling Paint & Cracked Walls: The Hobby Room has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 0 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Game Room | This is the main bedroom on the 2nd floor. We plan to use this as the main gaming and entertainment room. | Peeling Paint & Cracked Walls: The Game Room has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 4 Windows in this room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Tiger Room | One of the two bedrooms that we will be designating as sleeping quarters or “chambers”, the Tiger Room will be set up with a specific theme in mind. |
Peeling Paint & Cracked Walls: The Tiger Room has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 1 Windows in this room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Lovecraft Room | One of the two bedrooms that we will be designating as sleeping quarters or “chambers”, the Lovecraft Room will be set up with a specific theme in mind. |
Peeling Paint & Cracked Walls: The Lovecraft Room has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 1 Windows in this room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Main Bath Room | The Main Bath has a toilet, sink and a full sized claw foot tub. | Peeling Paint & Cracked Walls: The Main Bath has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 1 Windows in this room. | |||||
Toilet | Plumbing: The toilet needs to be re-seated on the sewer line and connected to the water lines to be fully functional.
The pipes have been repaired/replaced! |
|||||
Sink | Plumbing: The sink needs to be connected to the water lines to be fully functional.
The pipes have been repaired/replaced! |
|||||
Claw Foot Tub | Plumbing: The Claw Foot Tub needs to be connected to the water lines to be fully functional. Some paint is chipping away on the sides and should be repainted. The pipes have been repaired/replaced! |
|||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Back Hallway | The Rear Hallway connects The Office, and the Stairs to the Attic with the 2nd Floor Main Hallway | Peeling Paint & Cracked Walls: The Rear Hallway has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 1 Windows in this room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | There is no electric in this area. | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Back Office | This is another bedroom area that we are going to designate as the home Back Office. This is where “Work From Home” can and will happen. |
Peeling Paint & Cracked Walls: The Back Office has paint that is chipping and peeling away from the walls. The walls also show signs of settling damage that will need to be patched before able to be painted again. |
|||
Windows | There are 1 Windows in this room. | |||||
Hot Water Baseboard | The conduits in which the house is heated through two temperature zones. | The pipes have been repaired/replaced! | ||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Stairs to the Attic | Small Stairway to the Attic. | Small Debris: The Stairway to the Attic has a collection of dirt and debris that needs to be cleared up. | |||
Windows | There are 0 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Front Balcony | Balcony Water Damage: The Front Balcony is listing more than it should because there is water damage to several of the floor boards. |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
2nd Floor | Back Balcony | Balcony Water Damage: The Back Balcony is listing more than it should because there is water damage to several of the floor boards and structural supports. |
||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Attic | Front Area | This Area is able to be fully stood up in, and has a built in Wardrobe. | ||||
Windows | There are 3 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Attic | Back Area | This is where you enter into the Attic and the ceiling is close when walking through it. This will be storage space. | ||||
Windows | There are 1 Windows in this room. | |||||
Electric | Plugs & Light Switches within the room. | The electric has been restored! | ||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Yard | Front Yard | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Yard | East Side Yard | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Yard | Back Yard | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Yard | Back Yard Extension | |||||
Area | Room | Service/Equipment | Original | Current | Description | Notes |
Yard | West Side Yard |